Project Location: King Hussein International Airport in Aqaba

Project Description:

Implementation and development of the exterior facades and main entrances of the passenger terminal at King Hussein International Airport, along with landscaping and site development in front of the terminal, for both the airside and groundsideThe ground floor and the construction of an outdoor cafeteria, including all required electromechanical works, as per the design plans, 3D renderings, bills of quantities, and specifications, will include the following:
Execution of exterior facade works and main entrances Based on the design concept and plans for the passenger terminal, this includes lighting, canopies, signage, and the logo wherever it appears, along with the execution of all required works and everything necessary to reach the destinations as per the design Exterior landscaping works for both the airside and groundside of the passenger terminal At the locations specified in the design plans and according to the items listed in the bills of quantities, including:

(Interlock paving works, planting works and supply of agricultural soil, outdoor seating, planting beds All types of canopies and any decorative elements included in the design plans, lighting works Construction of an outdoor cafeteria with an area of ​​(55m²) including all required architectural, structural, electrical, and mechanical works according to the plans.

" />